monitor as
received oil soaked
Mazaks are good
for being covered
with oil
flyback transformer
is oil soaked
and may be arcing
to the frame
all pc boards are
removed and cleaned
and dried in our
drying chamber
pc boards installed
and is tested
and ready to ship